Carcross Bridge Construction, 2007
Everything then has to be hauled down the beach a few hundred yards to the construction site. This photo, also taken on May 7, shows the large-diameter pilings for the
temporary bridge that will support the pile driver as it drives the smaller pilings for the permanent bridge.