ExploreTheYukon.com - Your Gateway to the Yukon Territory

Carcross Bridge Construction, 2007

May 30 - the piledriver, which was brought in from Ontario, is hard at work. A heavy but temporary bridge is being built for it to work from - the lighter permanent bridge will be built on the upstream side of it, generally on the same site as the wooden bridge.

This photograph is © 2007 by Murray Lundberg, and is not to be copied without express permission.
Construction of a new steel footbridge at Carcross, Yukon, in 2007



.