Carcross Bridge Construction, 2007 June 20 - with the first 6 permanent pilings driven, the prefabricated steel sections of the permanent bridge were delivered and brought down the beach to the construction area.
Carcross Bridge Construction, 2007
June 20 - with the first 6 permanent pilings driven, the prefabricated steel sections of the permanent bridge were delivered and brought down the beach to the construction area.
This photograph is © 2007 by Murray Lundberg, and is not to be copied without express permission.