Carcross Bridge Construction, 2007 June 24 - the last of the pre-fabricated steel sections of the north end of the permanent bridge is lowered into place.
Carcross Bridge Construction, 2007
June 24 - the last of the pre-fabricated steel sections of the north end of the permanent bridge is lowered into place.
This photograph is © 2007 by Murray Lundberg, and is not to be copied without express permission.